25 August 2005

One More Completed Project


A sweater for Thing 2. It's Isabel's Sweater, from "Knitter's Stash." I made it in grape-colored Katia Himalaya, with yellow Berroco Pronto for the trim. It was slightly traumatic, because I ended up just a few dozen yards short on the Himalaya, and my original source, Elann, no longer has this color. Fortunately, I found it elsewhere online (Perfect Touch Yarns, to be precise), and thanks to Priority Mail, I had it in hand in 3 days. And there's no discernible line from unmatching dye lots.

I think this will look cuter on, but there's no way I'm going to make Cutie Pie model a heavy sweater when it's 95 degrees out. So instead, I have posed it in its natural element, among the detritus of an evening's playing. Tonight, the girls were playing Veterinarian, Pirates, Taking Care of Babies, and Putting Things in Bags.

11 August 2005

Tooth Fairy Purse


Thing One has her very first loose tooth. So what does she need? A felted Tooth Fairy purse, of course! In the requisite 5-year-old girl colors: purple and pink.

09 August 2005


Felted laptop bag from Stitch 'n Bitch Nation. It fits my laptop perfectly. I finished the knitting and felting last week, and then bought the zipper while were in Oregon, celebrating my sister's wedding.

The view from the car as we headed north near Mt. Shasta. Note the bug spots on the windshield. We drove at night on the way home. Less scenic, but, with 2 young kids, waaay quieter.